CLIENT

Wavespec Ltd, Maldon, Essex, UK

 
LOCATION

Sembawang Shipyard, Singapore and Swan Hunter Shipyard, Wallsend

 
PERIOD

January 1995 To December 1995 and January 1996 To February 1998

 
PRO-TEC

Was here with an Electrical Projects Engineer.

 
PROJECT

To assist in the design and development of an electrical power system associated with the conversions of a bulk carrier to a pipelay vessel. To scrutinise and approve of the design of subcontractors machinery and equipment and supervise the installation of same. Prepare commissioning procedures for all systems and oversee proper completion of same. All on behalf of Allseas Engineering of the Netherlands.

Bulker to pipelayer-metamorphosis
     

 

 

 

 

 

 
CLIENT

ASC Benelux, The Netherlands

 
LOCATION

Swan Hunter Shipyard, Wallsend, The Firth of Forth and at Sea

 
PERIOD

November 1997 To November 1998

 
PRO-TEC

Was here with 6 Marine Engineers/Commissioning Engineers.

 
PROJECT

To assist in the installation and commissioning of machinery and equipment, fitting of 8 bow and stern thrusters, followed by sea trials and operational commissioning. All on behalf of Allseas Engineering B.V.